Recent work
A running log of jobs across Deal, Walmer, Kingsdown, Mill Hill and the CT14 villages. Updated as we finish them. Prices are the actual final price for that job - a Georgian terrace fusebox is not a Mill Hill fusebox and the numbers reflect that.
1980s split-load board with tired MCBs replaced with 10-way full-RCBO metal-enclosed 18th Edition Amdt 2 board. SPD integrated. Party-wall meter position, tight fit, custom trunk to serve tenant bathroom sub-circuit.
Rear-drive install on 1930s villa. G98 with load management notified to UK Power Networks Southern. 20m cable route in SWA under the boundary.
Four IP44 external sockets rotted through the gasket line after three seasons. Replaced with IP66 marine-grade enclosures and stainless fixings. Consumer unit terminations re-torqued at the same visit.
C2 on missing bathroom supplementary bonding, C3 on plastic-enclosure consumer unit. Bonding installed same day. Consumer unit swap scheduled for later this month. Report re-issued satisfactory.
12 fire-rated IC-rated IP65 downlights on trailing-edge dimmer, separate under-cabinet strip on its own driver and switched feed. Existing dimmable-flicker problem solved.
Legacy rod corroded through, RCD trip times marginal. New 1.2m copper rod bonded to consumer unit main earth. Ze re-tested at 22 ohms. All final circuits Zs within tabulated limits.
Roof survey and drawings for a rear-slope 3.6kWp all-black array. Pre-application submitted to DDC conservation officer. Awaiting response before formal application.
Full house rewire over 7 days. New 10-way full-RCBO board, SPD, AFDD on bedroom rings, all zone-compliant bathroom fittings. Building Regulations compliance certificate issued.